Infrastructure

back

Metrô linha 2 verde

back

Infrastructure

back
Metrô linha 2 verde

Metrô linha 2 verde

Client: Metrô - Companhia do Metropolitano de São Paulo
Segment: Railroads and Metro
Timeframe: 23 months
Extension: 6.843 m de ferrovia.
Location: São Paulo | SP
Client:

Metrô - Companhia do Metropolitano de São Paulo

Segment:

Railroads and Metro

Timeframe:

23 months

Extension:

6.843 m de ferrovia.

Location:

São Paulo | SP

Scope

Engineering design, materials and equipment supply, and assembly of permanent track superstructure of the third track system for the Subway Line 2 – Green (Consortium).