Metrô linha 2 verde
Client: |
Metrô - Companhia do Metropolitano de São Paulo |
Segment: |
Railroads and Metro |
Timeframe: |
23 months |
Extension: |
6.843 m de ferrovia. |
Location: |
São Paulo | SP |
Client:
Metrô - Companhia do Metropolitano de São Paulo
Segment:
Railroads and Metro
Timeframe:
23 months
Extension:
6.843 m de ferrovia.
Location:
São Paulo | SP
Scope
Engineering design, materials and equipment supply, and assembly of permanent track superstructure of the third track system for the Subway Line 2 – Green (Consortium).