Angra linha 3
Client: |
Transpetro - PETROBRAS |
Segment: |
Oil and Gas |
Timeframe: |
20 months |
Quantitativo: |
Tubulação de 30” e 36”: 1.100 m² / 424 t |
Location: |
Angra dos Reis | RJ |
Client:
Transpetro - PETROBRAS
Segment:
Oil and Gas
Timeframe:
20 months
Quantitativo:
Tubulação de 30” e 36”: 1.100 m² / 424 t
Location:
Angra dos Reis | RJ
Scope
Replacement of Line 3 Oil Pipeline at the Augusto da Fonseca Maritime Terminal owned by TRANSPETRO