Anglo American
                
                    
                        | Client: | Anglo American. | 
                    
                        | Segment: | Mining | 
                    
                        | Timeframe: | 22       months | 
                    
                        
                            | Volume: | 49.000 m³ vol. concreto | 
                    
                    
                        | Location: | Conceição do Mato Dentro | MG | 
                
                
                    Client:
                    Anglo American.
                    Segment:
                    Mining
                    Timeframe:
                    22       months
                    
                        Volume:
                        49.000 m³ vol. concreto
                    
                    Location:
                    Conceição do Mato Dentro | MG
                 
                
                    Scope
                
                
                    Construction of water harvesting and channeling system from Santa Barbara River, comprising four pumping stations, including infrastructure, civil and assembly services, 28” carbon steel pipe installation, mounting of steel structures, electromechanical installations, and electrical rooms.